PROJECT TITLE

ALDINGTON ROAD INDUSTRIAL ESTATE

LOCATION

200 Aldington Road, Industrial Estate

BUDGET

$1.0m - $1.1m

DURATION

9 Weeks, Commencement June 2024

SERVICES

Earthworks, Stormwater Drainage & Environmental Restoration

SECTOR

Industrial & Private

about

The installation of a comprehensive stormwater drainage system

For the Aldington Road Industrial Estate project, Simmons Civil engaged J Group to install a comprehensive stormwater drainage system. The scope involved the excavation, bedding, laying, backfilling, and compaction of reinforced concrete pipes (RCP) ranging from DN375 to DN1650, ensuring efficient drainage across the site. Sacrificial sandbag cut-off walls were also installed to manage water flow during construction.

In addition, precast drainage pits were installed, with sizes ranging from 600x600 to 1200x1200, as part of the stormwater management system. Provisions for precast headwalls were made to accommodate pipes both smaller and larger than DN600. For the project, J Group delivered a reliable, efficient, and environmentally sustainable stormwater solution for the industrial estate.

THE SCOPE

Reinforced Concrete Pipes (RCP) Installation:

• Excavation, bedding, laying, backfilling, and compaction of RCPs ranging from DN375 to DN1650.Sacrificial Sandbag Cut-off Walls:

• Installed to manage water flow effectively during construction for pipes across the DN375 to DN1650 range.Precast Drainage Pits:

• Installation of pits ranging from 600x600 to 1200x1200 (average depth <1.5 m), integrated into the stormwater management system.Precast Headwalls:

• Pipes smaller than DN600• Pipes larger than DN600

ADDITIONAL WORKS

results

Successful delivery of a robust and sustainable stormwater drainage system

The result of the Aldington Road Industrial Estate project was the successful delivery of a robust, efficient, and environmentally sustainable stormwater drainage system. J Group’s execution ensured minimal disruption to the surrounding environment and adherence to industry standards, providing long-term reliability for the industrial estate’s infrastructure. The project met all client specifications, was completed within the agreed timeframe, and contributed to the overall functionality and safety of the estate.